After travelling with a 23.2 kg hold bag full of cylinder head and exhaust elbow it was time to repair the generator.
As always what starts as a 3 to 4 hour job soon becomes a 10 hour endurance run.
Trying to get one nut on took 3 hours as there was such limited access, but eventually the threads caught and by 20:00 we have the generator kick into life and ready to power up the most single important device on board. Elaine’s hair drier 🙂
Anyway, job done and on with the next.